Cedartown Case Study

Cleaning up the inlet!
Cleaning up the inlet!
(Before) shoreline creeping into the pond
(Before) shoreline creeping into the pond
Temporary Siphon installation to lower water levels
Temporary Siphon installation to lower water levels
Clean shoreline on the dam side (water level still lower)
Clean shoreline on the dam side (water level still lower)

Reclaiming the peninsula
Reclaiming the peninsula

Final Grade
Final Grade
Hydro-seed down on final grade
Hydro-seed down on final grade
New overflow being installed
New overflow being installed
Phone: (770) 417-4089
© 2025 Aquatic South